Precast MV cable trenches for the Domeyko Solar + BESS project project - Image 1 Precast MV cable trenches for the Domeyko Solar + BESS project project - Image 2 Precast MV cable trenches for the Domeyko Solar + BESS project project - Image 3 Precast MV cable trenches for the Domeyko Solar + BESS project project - Image 4 Precast MV cable trenches for the Domeyko Solar + BESS project project - Image 5 Precast MV cable trenches for the Domeyko Solar + BESS project project - Image 6 Precast MV cable trenches for the Domeyko Solar + BESS project project - Image 7 Precast MV cable trenches for the Domeyko Solar + BESS project project - Image 8 Precast MV cable trenches for the Domeyko Solar + BESS project project - Image 9 Precast MV cable trenches for the Domeyko Solar + BESS project project - Image 10 Precast MV cable trenches for the Domeyko Solar + BESS project project - Image 11

1 / 11

Project overview

Domeyko Solar + BESS (Luna de Verano), developed by Verano Energy in the municipality of Vallenar, Atacama Region, combines 83 MWp of solar PV generation with a 660 MWh battery energy storage system (BESS), with an investment of US$247 million. Its output is committed to Abastible under a 15-year power purchase agreement (PPA), and commercial operation is scheduled for late 2026.

Our contribution

For Globaltec, Ecomundo manufactured the medium-voltage trenches that house the ø200 and ø160 mm HDPE conduits of the BESS–Switchgear Room duct bank. Each module integrates base, walls and cover in a single piece, allowing dry assembly section by section, with no formwork or concrete pouring on site.

Highlights

  • Fast installation: piece by piece with a crane, with no curing times and no weather dependency.
  • Standard truck transport, with no special permits, ideal for remote desert sites.
  • Factory geometry: precise alignment between modules and an R10,000 curvature radius at changes of direction.
  • Every element factory-certified, in compliance with CNE/SEC regulations.

Key project figures

83 MWpof solar PV generation
660 MWhof battery energy storage (BESS)
US$247 Mproject investment
15 yearspower purchase agreement (PPA) with Abastible