Energy / BESS and substations
Precast foundations for the El Manzano and Libélula substations
Precast foundations for equipment (surge arresters, line gantries, transformers) and cable trenches
Project overview
Libélula is Engie’s first energy project in the Santiago Metropolitan Region: a 140 MW solar PV plant with a 203 MW / 1,034 MWh battery system, with an investment of US$320 million. Its step-up substation connects to the El Manzano Substation through a 220 kV, 16 km transmission line.
Our contribution
Ecomundo was awarded the supply of precast concrete solutions for the Libélula and El Manzano substations.
The scope includes specific foundations for surge arresters, line gantries and transformers, together with precast trenches for power and control cabling. These pieces are manufactured in our plant under dimensional control, arrive ready to install and reduce concrete work on site.
Highlights
- Standardized foundations for different electrical equipment.
- Shorter schedules and less risk on site: the pieces arrive finished.
- Plant-controlled quality and high durability.
Key project figures
Let’s build the future together
We deliver
end-to-end solutions
Our engineering team provides support throughout the entire process, from assessment and design to installation, developing solutions aligned with the requirements of each project.